For the planned construction of a new logistics warehouse in Trossingen, LIST Eco was commissioned by its sister company, LIST Bau Stuttgart, to conduct a Carbon Due Diligence Light and a climate risk analysis.

In the course of the project work, the current state (thermal envelope, building systems) was first examined and described, followed by the target state (measures, design). The building was then classified into a CRREM path for the “Industrial, Distribution Warehouse” category based on the framework parameters, and the stranding dates for the current and target states were compared using various variables.

The Climate Risk Analysis

Our services also include a funding analysis and a climate risk analysis. Assessing the impacts of climate change on individual parameters—known as climate indicators—is crucial for many aspects of the building, both today and in the future. Specifically, this involves examining the trends of key climate indicators (heat, precipitation, storms, etc.) in the near and distant future. To this end, we offer an analysis of the specific, physical impacts of climate change on the real estate project, as required by the EU Taxonomy for Sustainable Finance in Annex II, Section 7.1. In particular, this involves incorporating forward-looking data (forecasts) on potential developments and using recognized scenarios to calculate possible trajectories for a property with regard to financial and non-financial climate risks. The analysis served to reduce the financial risk associated with planning for future climate events, both for existing buildings and for potential new construction. In this context, operational and nature-based solutions were prioritized.

Energy model, southeast view, as of May 7, 2024:

Actual and Target Stranding Times (Variant 9, including PV):

Partners

When depth is needed, we bring it in.

When a project requires specialized expertise, we work with select partners: intecplan, Brandberger, p5, Dan Pearlman, and others.

All partners

References

How Our Work Is Measured

Not beauty, but impact

All projects

DGNB ESG Verification for Assessing Compliance with the EU Taxonomy

New Office Building in Düsseldorf

The "Le Coeur" project is a modern office complex in the heart of Düsseldorf that was redesigned as part of a high-end development project.

  • Duration March 24 through present
  • BGF approx. 40,000 square meters
Learn More

DGNB Certification with the QNG Seal, including an analysis of available funding options

Neighborhood in Cologne

In Cologne-Rodenkirchen, PE Ringviertel GmbH & Co. KG is planning to develop a residential neighborhood and a daycare center.

  • Duration November 2023 through present
  • BGF 60,500 square meters
Learn More

Carbon Due Diligence Premium

Office in Dortmund

Ashtrom Properties Germany GmbH commissioned LIST Eco to conduct a Carbon Due Diligence Premium for two adjacent buildings in Dortmund.

  • Duration 11/23 to 07/24
  • BGF 5,512 square meters
Learn More

Building Physics & Related Sustainability Services

Neighborhood in Cologne

With the Deutz Harbor project, a new mixed-use urban neighborhood is taking shape in Cologne, with space for approximately 7,000 residents and around 6,000 jobs.

  • Duration 2026 through approximately 2032
  • BGF approx. 26,000 square meters
Learn More

Carbon Due Diligence

Showroom & Office in Heilbronn

In Heilbronn, the focus was on an existing building (built in 2003) that is used as an exhibition hall and office.

  • Duration April 24 to October 24
  • BGF Approx. 1,800 square meters of exhibition space, approx. 1,600 square meters of office space
Learn More

Sustainability Plan

Commercial Real Estate in Darmstadt

Following an initial joint project with ALÌTUS, the two organizations continued to collaborate in the so-called Rotunde building until mid-2026.

  • Duration 10/24 to 06/26
  • BGF 4,247 square meters
Learn More

Carbon Due Diligence Light & Thermal Simulation

Office building in Karlsruhe

Pfeiffer & May SE commissioned LIST Eco to conduct a Carbon Due Diligence Light assessment for an existing office building in Karlsruhe.

  • Duration April 24 to June 25
  • BGF approx. 2,300 square meters
Learn More

Circularity Assessment of the Building Structure and MEP

Office in München

Germany's first project in which MEP was fully integrated into the circularity assessment.

Learn More

Carbon Due Diligence Premium

Existing mixed-use property in Plochingen

In the spring of 2024, Pfeiffer & May Stuttgart KG commissioned LIST Eco to conduct a Carbon Due Diligence Premium for an existing mixed-use building in Plochingen.

  • Duration April 24 to July 24
  • BGF approx. 10,300 square meters
Learn More

BNB Coordination & Consulting

University in Aachen

LIST Eco was commissioned by zarinfar, with BNB providing coordination and consulting services, to design the school building variant.

  • BGF approx. 10,636 square meters
Learn More

Building Resource Passport According to DGNB

Existing Logistics Building in München

For the Rupert-Bodner-Straße refurbishment project in München, a building resource passport was prepared for an existing building in accordance with the current DGNB guidelines.

  • Duration Jan. 26 through Mar. 26
Learn More

DGNB Platinum Certification

Fire Station in Düsseldorf

A new building for the volunteer fire department has been completed in the Kaiserswerth neighborhood of Düsseldorf; it was officially opened on July 11, 2025.

Learn More

ESG Verification & EU Taxonomy

Fürstenried West Neighborhood

In the Fürstenried West neighborhood of Munich, a modern 21st-century community is to be developed, offering a high quality of housing and living, affordable rental apartments, and newly constructed buildings.

  • Duration April 24 through ongoing
Learn More

Carbon Due Diligence & DGNB pre-check

KALA Central Campus in Darmstadt

ALÌTUS Capital Partners is in the process of revitalization and repositioning of the KALA commercial property in Darmstadt.

  • Duration September 23 to November 23
  • BGF approx. 11,500 square meters
Learn More

Carbon Due Diligence

Existing office building in Hamburg

An Office Building Under Scrutiny: Aside from a major renovation—what energy-efficient measures can be implemented quickly without disrupting day-to-day operations or inconveniencing tenants?

  • BGF approx. 25,000 square meters
Learn More

Scenario-Based CO2 Cost Analysis

Residential neighborhood in Berlin

As part of the acquisition advisory services for the “Marienhöfe” residential neighborhood in southern Berlin, a scenario-based analysis of potential CO₂ costs was conducted.

Learn More
LIST Eco New Construction - THE-WID-Cologne

Comprehensive Sustainability Initiatives

New Development District in Cologne

An open-concept think tank is taking shape in Cologne’s trendy Ehrenfeld neighborhood, featuring spaces such as offices, restaurants, and a fitness center. LIST Eco is part of “THE WID.”

  • Duration 20 months
  • BGF 90,000–95,000 square meters
Learn More

Sustainability Plan

Dombühl Logistics Park

DLH is planning a new logistics campus in the Bavarian municipality of Dombühl. LIST Eco was commissioned to develop the sustainability concept. The logistics campus is to consist of 61,100 square meters of warehouse and logistics space, 3,000 square meters of office space, and areas for manufacturing and production. All of this will be built on a plot of land covering nearly 125,500 square meters.

Learn More

GEG Certificates

Bergheim Business Park

In June 2024, Phase 5 International commissioned LIST Eco to prepare GEG certifications for five commercial buildings. These are part of the planned construction of a new business park in Bergheim, which is to be developed on behalf of Metroloq Projektentwicklung GmbH. The warehouses have usable floor areas (Gross Floor Area E00) of approximately 1,390, 3,540, 885, 515, and 1,020 square meters, respectively.

Learn More

Simulation of a New Building, building resource passport, and life cycle assessment (LCA)

Wangen

LIST Eco conducted an analysis of the demolition of an existing structure and its potential for the construction of a new LIDL store in Wangen.

Learn More

This website uses cookies 🍪

We use cookies, for example, to offer social media functions or to analyze access to our website. You consent to our cookies if you continue to use our website. To continue you must make a selection.  Further information on data protection and cookies can be found in our data protection declaration. Under Settings you can turn specific options on and off.

Settings

  • The site uses cookies to store session information. These are not personal and are not read by third-party servers. All of our images and files are located in our content management system Ynfinite and are made available from there. By providing this, Ynfinite receives your IP address, but this is only used for the purpose of providing the images as part of an HTTP call. The data is not stored long-term.

  • These cookies collect information { "statusCode": 500, "error": { "type": "SERVER_ERROR", "description": "ERROR: Undefined property: WhichBrowser\\Model\\Device::$model on line 323 in file \/var\/www\/vhosts\/list-gruppe.de\/httpdocs\/src\/Domain\/Request\/Utils\/TwigRenderer.php." } }