An Office Building Under Scrutiny: Aside from a major renovation—what energy-efficient measures can be implemented quickly without disrupting day-to-day operations or inconveniencing tenants?

The five-building complex was constructed in 1955 and has since been expanded, remodeled, and renovated several times. Using Carbon Due Diligence, LIST Eco analyzed the current energy performance of the existing building. This made it possible to clearly identify areas for optimization and the corresponding measures.

Manage for the environment.

The greatest potential for improvement lies in the building’s thermal envelope. Rock wool insulation and windows with double-pane insulated glass—if the exterior walls are re-insulated and the property’s windows are replaced as proposed, this will result in a CO2 reduction of approximately 31 percent. If all construction-related potential is fully realized, emissions will drop by as much as 46 percent.

The Sustainability Concept:

  • Identification of five structural and three systems-related measures
  • First, reduce the building’s energy demand (upgrading the building envelope)
  • Increasing savings in building systems through energy management
  • CRREM 1.2: Optimized variant delays stranding by 11 years
  • In the long term, design generation and transmission systems to be economically sustainable
  • Realistic cost estimates make renovation activities predictable and transparent

Downloads

Partners

When depth is needed, we bring it in.

When a project requires specialized expertise, we work with select partners: intecplan, Brandberger, p5, Dan Pearlman, and others.

All partners

References

How Our Work Is Measured

Not beauty, but impact

All projects

Carbon Due Diligence Premium

Office in Dortmund

Ashtrom Properties Germany GmbH commissioned LIST Eco to conduct a Carbon Due Diligence Premium for two adjacent buildings in Dortmund.

  • Duration 11/23 to 07/24
  • BGF 5,512 square meters
Learn More

Carbon Due Diligence

Showroom & Office in Heilbronn

In Heilbronn, the focus was on an existing building (built in 2003) that is used as an exhibition hall and office.

  • Duration April 24 to October 24
  • BGF Approx. 1,800 square meters of exhibition space, approx. 1,600 square meters of office space
Learn More

Sustainability Plan

Commercial Real Estate in Darmstadt

Following an initial joint project with ALÌTUS, the two organizations continued to collaborate in the so-called Rotunde building until mid-2026.

  • Duration 10/24 to 06/26
  • BGF 4,247 square meters
Learn More

Carbon Due Diligence Light & Thermal Simulation

Office building in Karlsruhe

Pfeiffer & May SE commissioned LIST Eco to conduct a Carbon Due Diligence Light assessment for an existing office building in Karlsruhe.

  • Duration April 24 to June 25
  • BGF approx. 2,300 square meters
Learn More

Carbon Due Diligence Premium

Existing mixed-use property in Plochingen

In the spring of 2024, Pfeiffer & May Stuttgart KG commissioned LIST Eco to conduct a Carbon Due Diligence Premium for an existing mixed-use building in Plochingen.

  • Duration April 24 to July 24
  • BGF approx. 10,300 square meters
Learn More

DGNB Platinum Certification

Fire Station in Düsseldorf

A new building for the volunteer fire department has been completed in the Kaiserswerth neighborhood of Düsseldorf; it was officially opened on July 11, 2025.

Learn More

Scenario-Based CO2 Cost Analysis

Residential neighborhood in Berlin

As part of the acquisition advisory services for the “Marienhöfe” residential neighborhood in southern Berlin, a scenario-based analysis of potential CO₂ costs was conducted.

Learn More

Carbon Due Diligence & Climate Risk Analysis

Trossingen Logistics Warehouse

For the planned construction of a new logistics warehouse in Trossingen, LIST Eco was commissioned by its sister company, LIST Bau Stuttgart, to conduct a Carbon Due Diligence Light and a climate risk analysis.

  • Duration March 2024 through September 2024
  • BGF 8,700 square meters
Learn More

This website uses cookies 🍪

We use cookies, for example, to offer social media functions or to analyze access to our website. You consent to our cookies if you continue to use our website. To continue you must make a selection.  Further information on data protection and cookies can be found in our data protection declaration. Under Settings you can turn specific options on and off.

Settings

  • The site uses cookies to store session information. These are not personal and are not read by third-party servers. All of our images and files are located in our content management system Ynfinite and are made available from there. By providing this, Ynfinite receives your IP address, but this is only used for the purpose of providing the images as part of an HTTP call. The data is not stored long-term.

  • These cookies collect information that helps us analyze how our website is used and how effective our marketing campaigns are. Data is evaluated with the help of Google and Facebook, for example. With the help of the analyses from this cookie, we can customize applications for you in order to improve our website. If you do not want us to track your visit to our website, you can disable tracking in your browser here.

  • We use third-party tools that help us make our website more efficient and customer-friendly. These include so-called marketing cookies, which we set in your browser. These send us data about the interests you provide us with by entering information in these third-party tools. By activating the marketing{ "statusCode": 500, "error": { "type": "SERVER_ERROR", "description": "ERROR: Undefined property: WhichBrowser\\Model\\Device::$model on line 323 in file \/var\/www\/vhosts\/list-gruppe.de\/httpdocs\/src\/Domain\/Request\/Utils\/TwigRenderer.php." } }