Skip to content

GEG Certificates

In June 2024, Phase 5 International commissioned LIST Eco to prepare GEG certifications for five commercial warehouses. These are part of the planned construction of a new business park in Bergheim, which is to be developed on behalf of Metroloq Projektentwicklung GmbH. The buildings have usable floor areas (Gross Floor Area E00) of approximately 1,390, 3,540, 885, 515, and 1,020 square meters, respectively.

The commissioned services for preparing the GEG verifications for the halls include, in each case: an energy balance analysis in accordance with DIN V 18599; verification of summer thermal protection via thermal simulation in accordance with DIN 4108-2; and the preparation of a component catalog for all components of the building’s thermal envelope. The aforementioned services and verifications were prepared based on the permit application documentation. According to the North Rhine-Westphalia Building Code, GEG verifications are structural engineering verifications that must be submitted to the building authority no later than the start of construction. As part of the verification process, compliance with the requirements of the GEG and other structural engineering regulations regarding primary energy demand, minimum thermal insulation, and the use of renewable energy is assessed.

The GEG Certification:

The GEG certification is a mandatory component of every new construction or renovation project and confirms that a building meets the energy requirements of the Building Energy Act (GEG). It forms the basis for the issuance of a building permit and provides planning certainty regarding compliance with the requirements for primary energy demand, thermal insulation, and the use of renewable energy. At the same time, the certification is an important prerequisite for applying for government subsidies, such as those under the Federal Program for Efficient Buildings (BEG). Furthermore, a GEG-compliant building contributes significantly to reducing energy consumption and CO2 emissions, thereby fulfilling key criteria for sustainable construction. The GEG certification thus combines legal requirements with environmental responsibility and economic efficiency.

Excerpt from the site plan:

Partners

When depth is needed, we bring it in.

When a project requires specialized expertise, we work with select partners: intecplan, Brandberger, p5, Dan Pearlman, and others.

All partners

References

How Our Work Is Measured

Not beauty, but impact

All projects

DGNB ESG Verification for Assessing Compliance with the EU Taxonomy

New Office Building in Düsseldorf

The "Le Coeur" project is a modern office complex in the heart of Düsseldorf that was redesigned as part of a high-end development project.

  • Duration March 24 through present
  • BGF approx. 40,000 square meters
Learn More

DGNB Certification with the QNG Seal, including an analysis of available funding options

Neighborhood in Cologne

In Cologne-Rodenkirchen, PE Ringviertel GmbH & Co. KG is planning to develop a residential neighborhood and a daycare center.

  • Duration November 2023 through present
  • BGF 60,500 square meters
Learn More

Building Physics & Related Sustainability Services

Neighborhood in Cologne

With the Deutz Harbor project, a new mixed-use urban neighborhood is taking shape in Cologne, with space for approximately 7,000 residents and around 6,000 jobs.

  • Duration 2026 through approximately 2032
  • BGF approx. 26,000 square meters
Learn More

Sustainability Plan

Commercial Real Estate in Darmstadt

Following an initial joint project with ALÌTUS, the two organizations continued to collaborate in the so-called Rotunde building until mid-2026.

  • Duration 10/24 to 06/26
  • BGF 4,247 square meters
Learn More

Carbon Due Diligence Light & Thermal Simulation

Office building in Karlsruhe

Pfeiffer & May SE commissioned LIST Eco to conduct a Carbon Due Diligence Light assessment for an existing office building in Karlsruhe.

  • Duration April 24 to June 25
  • BGF approx. 2,300 square meters
Learn More

Circularity Assessment of the Building Structure and MEP

Office in München

Germany's first project in which MEP was fully integrated into the circularity assessment.

Learn More

BNB Coordination & Consulting

University in Aachen

LIST Eco was commissioned by zarinfar, with BNB providing coordination and consulting services, to design the school building variant.

  • BGF approx. 10,636 square meters
Learn More

Building Resource Passport According to DGNB

Existing Logistics Building in München

For the Rupert-Bodner-Straße refurbishment project in München, a building resource passport was prepared for an existing building in accordance with the current DGNB guidelines.

  • Duration Jan. 26 through Mar. 26
Learn More

DGNB Platinum Certification

Fire Station in Düsseldorf

A new building for the volunteer fire department has been completed in the Kaiserswerth neighborhood of Düsseldorf; it was officially opened on July 11, 2025.

Learn More

ESG Verification & EU Taxonomy

Fürstenried West Neighborhood

In the Fürstenried West neighborhood of Munich, a modern 21st-century community is to be developed, offering a high quality of housing and living, affordable rental apartments, and newly constructed buildings.

  • Duration April 24 through ongoing
Learn More

Carbon Due Diligence & DGNB pre-check

KALA Central Campus in Darmstadt

ALÌTUS Capital Partners is in the process of revitalization and repositioning of the KALA commercial property in Darmstadt.

  • Duration September 23 to November 23
  • BGF approx. 11,500 square meters
Learn More
LIST Eco New Construction - THE-WID-Cologne

Comprehensive Sustainability Initiatives

New Development District in Cologne

An open-concept think tank is taking shape in Cologne’s trendy Ehrenfeld neighborhood, featuring spaces such as offices, restaurants, and a fitness center. LIST Eco is part of “THE WID.”

  • Duration 20 months
  • BGF 90,000–95,000 square meters
Learn More

Carbon Due Diligence & Climate Risk Analysis

Trossingen Logistics Warehouse

For the planned construction of a new logistics warehouse in Trossingen, LIST Eco was commissioned by its sister company, LIST Bau Stuttgart, to conduct a Carbon Due Diligence Light and a climate risk analysis.

  • Duration March 2024 through September 2024
  • BGF 8,700 square meters
Learn More

Sustainability Plan

Dombühl Logistics Park

DLH is planning a new logistics campus in the Bavarian municipality of Dombühl. LIST Eco was commissioned to develop the sustainability concept. The logistics campus is to consist of 61,100 square meters of warehouse and logistics space, 3,000 square meters of office space, and areas for manufacturing and production. All of this will be built on a plot of land covering nearly 125,500 square meters.

Learn More

Simulation of a New Building, building resource passport, and life cycle assessment (LCA)

Wangen

LIST Eco conducted an analysis of the demolition of an existing structure and its potential for the construction of a new LIDL store in Wangen.

Learn More

Ecological Analysis

Office Building in Nuremberg

LIST Eco was commissioned to assess the impact of preserving and renovating an existing building versus demolishing it and constructing a new one in terms of building- and operational-related CO2 emissions for an office building in Nuremberg.

Learn More
LIST-Eco-Empress-Theophanu-School-Cologne

Potential Analysis

Empress Theophanu School, Cologne

By creating high-quality BIM models for architecture and structural engineering, LIST Eco produced BIM-based building resource passports in accordance with DGNB standards for a comparison of options involving existing buildings, renovation projects, and new construction. This was done based on a feasibility study conducted by the Cologne Building Authority.

Learn More

Sustainable Concept Development and Implementation

Business Park in Bremen

Tested, optimized, and designed for sustainability: A taxonomy-compliant business park has been developed in Bremen. The entire LIST Gruppe provided intensive support for the construction project.

  • BGF 5,285 square meters
Learn More
Aerial view of the FIEGE Ecologistics™ Park in Greven, featuring a modern logistics warehouse, a green roof, and surrounding infrastructure. - ©Quelle: FIEGE Logistik Stiftung & Co. KG

FIEGE Ecologistics™ Park

Greven

In Greven, the FIEGE Logistik Stiftung is developing a flagship project for sustainable logistics. For the project, LIST Eco has developed a concept that promotes biodiversity, strikes a balance between functionality and environmental quality, and transforms the logistics site into a habitat.

  • BGF approx. 27,000 square meters
Learn More

This website uses cookies 🍪

We use cookies, for example, to offer social media functions or to analyze access to our website. You consent to our cookies if you continue to use our website. To continue you must make a selection.  Further information on data protection and cookies can be found in our data protection declaration. Under Settings you can turn specific options on and off.

Settings