Warum es geht
Uninspected dismantling means wasted materials.
Demolition without prior assessment and transparency results in a loss of material value, usually because reliable inventory data is not available when the demolition is commissioned. Funding programs and certification systems now require a documented audit as a prerequisite.
The key lies in the next steps: An inventory alone does not lead to reuse or recycling. Only when selective demolition, processing, and logistics follow can we create a foundation that ensures building components enter a second life cycle rather than ending up as construction waste.